Measurement and monitoring

Cracks, movement and measurements in buildings.

Finishing construction: close out the monitoring properly

The machinery has left, but the monitoring job is not complete until the records are assembled.

Read the guide

When excavation takes place close to your house

When a trench approaches the foundation, it is natural to pay closer attention.

Read the guide

What does a gap in monitoring data mean?

A blank part of a graph does not explain why data is missing.

Read the guide

Monitoring during sheet piling and piling

Sheet piles and foundation piles can be installed using different methods.

Read the guide

Monitoring during breaking and demolition

Concrete breaking may happen in short sessions at different positions throughout the day.

Read the guide

New cracks while nearby construction is underway

You notice a crack while work is taking place nearby.

Read the guide

NS 8141: what needs clarification before monitoring?

When monitoring is ordered “to NS 8141”, the request should also identify the question to be examined.

Read the guide

Planning monitoring throughout a construction project

A monitor installed at the start of a project will not necessarily cover every later phase.

Read the guide

Where should a vibration monitor be installed?

A suitable monitor location depends on what is being measured.

Read the guide

How to read a vibration monitoring report

Start with where and when the measurements were taken.

Read the guide

Before construction starts: record the building's condition

Does the house already have cracks, sticking doors or signs of moisture? Include them in the record before construction begins.

Read the guide

Requesting vibration monitoring: information to prepare

An address and a short description of the work are a useful starting point.

Read the guide

Timestamps and the work log in a monitoring report

A monitor records an event at 13:42, but the work log says only “excavation after lunch”.

Read the guide

Why one vibration limit does not fit every building

A number in a neighbour's report can look like a convenient answer.

Read the guide

Vibrations from compaction and rolling

A roller or plate compactor may pass over the same area repeatedly.

Read the guide

Vibration monitoring during blasting

Each blast is a distinct event.

Read the guide

What happens when a monitoring alert is triggered?

Before construction starts, establish who receives monitoring alerts and what they are expected to do.

Read the guide

Vibration monitoring during roadworks near your home

Is the road outside your home being excavated or resurfaced? Start by asking what work is planned and when it will take place near your property.

Read the guide

Vibration, settlement and tilt: choose the right measurement

A sticking door, a crack in a wall and vibrations during roadworks are different observations.

Read the guide

Is the crack changing? How to keep track

How photographs, fixed measurement points and repeated readings help you follow a crack in your building.

Read the guide