When a trench approaches the foundation, it is natural to pay closer attention. First establish what is being excavated, its expected depth and how the work is planned. Keep the project notice and the name of the contact person.

Separate observations from the measurement task

Shaking inside the house, a crack opening and a door beginning to catch are different observations. Record each with its time and location. A vibration instrument records vibration at its measurement point. The need to track slow movement or changes in ground conditions requires separate consideration.

NGI’s work on damage reduction during groundworks covers several mechanisms that can affect neighbouring buildings. Ordering “a monitor” before identifying the question is therefore of limited use. Ask the person planning the follow-up to explain which observations and methods are relevant.

Keep a simple event record

Note when excavation moves along the house, when the working method changes and when you first observe a change. Take photographs from a safe position and keep the originals. Do not enter the work area or trench to document it.

Report rapid changes to the project’s responsible contact immediately rather than waiting for the next periodic report. If there is danger, safety and necessary assistance take priority.

A short record of events, photographs and available measurements makes it easier to establish what needs further investigation. Describe the work beside your house and we can help organise relevant measurements and follow-up.

What to check

  • Ask for the trench plan and responsible contact person.
  • Record shaking and gradual changes separately.
  • Take photographs safely without entering the work area.