A monitor installed at the start of a project will not necessarily cover every later phase. Work may move, different machinery may be introduced, and a building far from the first stage may be close to the next. The monitoring plan should follow the work programme.

Organise the period around the activities

Use the contractor’s programme to identify what happens where. Mark expected excavation, any blasting, foundation work and compaction. Include who reports changes. A revised programme should trigger a check that measurement positions remain relevant.

Agree installation and removal dates too. The interval between the last reading and the last vibration-producing activity should not become an unexplained gap. If work stops temporarily, make clear whether recording continues and who looks after the equipment.

Assign follow-up responsibilities

Someone needs to check that data is arriving, alerts reach their recipients and questions from the site are answered. This cannot depend on somebody happening to open a report. Record a main contact, a backup and the procedure for reporting problems.

If a monitor is moved, the change must be traceable in the report. Readings from different positions should not be presented as though the instrument stayed in one place. Photographs, timestamps and the reason for moving it are useful parts of the record.

The final delivery should identify the monitoring periods, locations, recorded interruptions and accompanying documents. Describe the phases of your project if you need help with a plan that follows the work from start to finish.

What to check

  • Link monitoring periods to the contractor's work phases.
  • Assign responsibility for operational checks and plan changes.
  • Record each monitor move with its location and time.