When monitoring is ordered “to NS 8141”, the request should also identify the question to be examined. The series covers different tasks. Assessing effects on a structure, considering quick-clay slope stability and recording condition before work have different purposes.

State the task to be carried out

Standard Norge’s overview distinguishes Part 1 on vibration and air-overpressure effects on structures, Part 3 on vibrations and landslides in quick clay and other brittle materials, and Part 4 on pre-construction inspection. A guide to the series is also available. The specification should be precise enough for the client and provider to understand the same task.

Ask for the applicable edition and relevant assumptions to appear in the monitoring plan. Use the full standard and appropriate expertise when selecting methods or limits. A product page showing a standard setting in an instrument does not describe the complete project assessment.

Define the delivery, not only the equipment

The order should identify buildings or areas covered, activities to be followed, how measurement points are documented and who handles alerts. Reporting must make the actual work understandable.

Also ask which information the provider needs from the project. Missing building, ground or working-method information should be identified before the start so it can be obtained or the assessment adjusted.

Owners should be able to ask for a short explanation of the selected arrangement. You need to understand what is measured and where to turn after an event. Send us the project details if you need help defining the monitoring task.

What to check

  • Describe the purpose before referring to a standard.
  • Include the applicable part and edition in the monitoring plan.
  • Identify project information that is still missing.