A blank part of a graph does not explain why data is missing. There may be a transmission or display problem, or recording may have stopped. Clarify this before describing the period as quiet.

Establish where the interruption occurred

Ask the person responsible for the instrument to check its operating status and available original data. Some instruments store data locally while transmitting it elsewhere. An empty online display does not necessarily mean all recordings are lost. This needs checking for the equipment actually used.

Record when the interruption was discovered, the affected period and who is investigating. If the instrument moved, underwent maintenance or lost power, include that information in the same record.

Make gaps in coverage clear

If data is recovered later, the report should show that the record has been completed. If it cannot be recovered, the period must remain identifiable as a gap. Do not draw a continuous line that could be mistaken for measurements across an undocumented interval.

Compare the interruption with site activities. Was the site closed, or was the activity the monitoring was commissioned for taking place? This helps establish the significance of the missing information and what follow-up is needed.

A practical operating-check routine reduces the chance of discovering a problem only at the final report. Describe the gap in your monitoring data and we can help distinguish recorded information, missing data and matters requiring investigation.

What to check

  • Establish whether recording or transmission was interrupted.
  • Compare the affected period with site activities.
  • Identify missing data clearly in the report.