A roller or plate compactor may pass over the same area repeatedly. To someone inside a house, this can feel like recurring shaking even when the work looks modest from a window. Monitoring is easier to plan when the equipment and its movements near the building are known.

Describe the work sequence

Ask the contractor which area will be compacted, the expected working periods and whether the machine or method may change. The log should distinguish compaction from other activities in the same area, such as breaking concrete or passing trucks.

A simple start and finish time for a work session can be more useful than a photograph with no timestamp. When recording your own observations, note where you were in the building. What you feel upstairs does not necessarily correspond directly to a foundation measurement.

Use an appropriate comparison

Readings need assessment using the selected method and the assumptions for the project. A value taken from an article about blasting is not a ready-made assessment of rolling beside a different building. NGI’s REMEDY project has investigated vibrations associated with construction activities, including compaction.

Agree how changes to machinery, working area or technique will be followed up. If an alert occurs, compare the relevant recording with the activity log before drawing conclusions about the event.

Ask us about monitoring during compaction. Include the address, planned working area and what you know about the equipment to help establish the scope.

What to check

  • Record the machine type and area to be compacted.
  • Distinguish compaction from other activities in the work log.
  • Agree a review if the method or working area changes.