A sticking door, a crack in a wall and vibrations during roadworks are different observations. They may belong to the same case, but the instrument should match the question you need answered.
Describe the change first
Record where the problem is, when you noticed it and whether it varies. A door may behave differently through the seasons, so one observation says little about a trend. Look for earlier photographs or measurements of the same location.
Vibration monitoring records vibrations at the measuring point. A crack gauge follows movement between its fixing points. A tilt sensor follows a change in angle. Tracking changes in level requires an appropriate arrangement and a reference that remains usable throughout the period.
Give each measuring point a purpose
“Is the house moving?” is too broad a question for choosing equipment. A more useful question might be whether a particular crack opens during excavation, or whether one corner changes level relative to a stable reference.
Record the direction, position and initial reading. Photographs of the mountings help reveal whether the equipment has been moved or damaged. Temperature, nearby work and other relevant conditions should accompany the records.
Read the results together
Several measurement types may be useful, but each needs a clear purpose. A crack-gauge graph does not replace an investigation into why the crack formed. The review should explain what the measurements show, what remains uncertain and which investigation could resolve it.
Tell us which change you want to track, including the room or building element and when you first noticed it.
What to check
- Describe the change you want to track.
- Find earlier photographs of the same point.
- Agree how the reference will be checked.