Start with where and when the measurements were taken. Clear graphs are difficult to use if the report does not identify the building or the days covered. Find the point name, location and any information about moves or interruptions.
Read the number with the measurement method
Check the measured quantity and its unit. Vibration reports may show particle velocity, often in mm/s, with results for several directions. Frequency and instrument settings can also matter. Do not compare two columns until you know they describe the same thing.
Ask for an explanation of any limit or alert lines. Who selected the value, on what basis, and does it apply throughout the period? An automatic instrument setting does not explain why a particular value is suitable for this building.
Find the event behind the peak
Use the date and time to compare a recording with the work log. Consider whether the graph shows isolated events or repeated work sessions. When one reading stands out, investigate both the recording and the conditions around the instrument.
It is also useful to understand how missing data is shown. A blank section of a graph is different from a period of low recorded values. Ask for clarification if the report does not distinguish them.
Keep the full report for any further assessment rather than only a screenshot of the maximum reading. Ask for help reviewing the monitoring report if the relationship between the readings and the work is unclear.
What to check
- Identify the measurement point, period and stated units.
- Ask for the basis of alert lines shown on graphs.
- Compare events of interest with the work log.