A suitable monitor location depends on what is being measured. Easy access or a good mobile signal is not enough. Ask what the point represents and how it relates to the building and nearby activities.
Establish the mounting surface first
The measurement provider needs to assess the building element, surface and fixing against the chosen method and the instrument instructions. A loose finish or a position on a different material may create a different basis from the one intended. Installation should not be improvised by whoever happens to be available.
Agree access with the owner and discuss drilling or other fixings beforehand. Consider concealed services and other features of the wall. If the proposed position cannot be used, assess an alternative before recording starts.
Keep a record of the whole position
A close photograph of an instrument may not identify the building or wall. Take an overview too and give the point an unambiguous label. Record the installation date, instrument identification and relevant settings.
If the equipment is moved, touched or removed during construction, tell the person responsible for the measurements. Do not replace it by eye and assume that the series is unchanged. A documented new setup is preferable to an unrecorded alteration.
Ask about positioning monitoring equipment when planning work near a building. Useful information includes the working area, the structure to be monitored and how access will be provided.
What to check
- Establish what the measurement point is intended to represent.
- Agree the fixing and access before installation.
- Take an overview photograph and record position changes.