An address and a short description of the work are a useful starting point. Planning vibration monitoring then requires an understanding of the activities, nearby buildings and the intended start date.

Describe the site

Give the address and mark the work area on a simple map if the location is difficult to explain. Say whether the work involves blasting, excavation, piling, sheet piling, breaking or compaction. Include the planned depth and distance to buildings where known.

Mention whether the work area moves. Roadworks may pass several homes over the project period. Instrument positions and coverage therefore need to follow the programme, rather than only the first day of work.

Gather building information

Provide available drawings, foundation information and earlier investigations. Identify known cracks, sensitive building elements and any equipment requiring particular consideration. Flag missing information early so that necessary checks can be planned.

Access to mounting points, power where required and an on-site contact affect the practical arrangements. A site visit may be needed to establish a suitable installation.

Define the required delivery

Explain the intended start, duration and who should receive alerts and reports. State whether you also need a pre-work building survey, follow-up during construction or a closing review.

Limits and the assessment basis need to suit the job. Reusing a number from another project is not enough to establish an appropriate monitoring arrangement.

Describe the site and intended start in the contact form. Start with the information you have; the remaining details can be collected before the arrangement is finalised.

What to check

  • Provide the activity, location and intended start.
  • Describe nearby buildings and known earlier damage.
  • Identify recipients for alerts and reports.