An insurance case can quickly accumulate emails, photographs and reports. It becomes easier to follow when you know what has been sent, which questions remain open and which company is dealing with each issue.
Start with the incident and correct recipient
Briefly describe what was discovered, where it happened and what has already been done. Use the claim reference in subsequent correspondence. Ask the insurer which records it requires and how to submit them.
Damage to the house and a possible claim arising from its purchase may be handled as separate matters. Do not assume information sent to one company automatically reaches another. Identify the recipient and case reference on each set of documents.
Gather records that answer the questions
Choose photographs showing both location and damage, and identify the room. Include relevant professional reports and invoices for completed measures. Retain the originals even when sending a smaller selection to make the case easier to read.
Prepare a short timeline covering discovery, notification, inspections and work. If a report has been revised, identify the current version. Record investigations that have not yet taken place so missing information is apparent.
Follow up the next question
After an inspection or letter, establish what is meant to happen next. Ask for clarification if it is unclear who will commission an investigation, which work can begin or which records are missing. Coverage needs to be determined with the insurer against the policy and circumstances.
Budsjekk can help organise the records and follow up the work around the damage. A clear account helps the people involved understand what still needs an answer.
What to check
- Link records to the correct claim reference and recipient.
- Prepare a short timeline of events and actions.
- Track which questions the insurer still needs answered.