After the initial notification, a case can stall between investigations, replies and further questions. A simple record of the next steps helps you follow up without retelling the whole story each time.
Establish what the recipient needs
Keep the acknowledgement and note any case reference. Read the reply carefully: does it request photographs, a report or information from the sale? Answer the specific request and explain if the document does not exist.
If you receive a general rejection, ask which information the assessment relies on. This helps establish whether the disagreement concerns facts, the technical cause or responsibility.
Keep investigations and correspondence together
Create a brief record with the date, event and related document. Include when you found the problem, who inspected it and when you sent further findings. Retain complete reports, even if only one paragraph is relevant to a particular message.
Arrange access if the seller or insurer wants to inspect. Before work changes the affected area, clarify the need to record and examine it. Urgent action to limit damage also needs to be dealt with.
Follow up the unresolved points
Finish each review with a practical task: who needs to answer which question, and when will it be followed up? If the case drags on, have the relevant time limits considered separately. Ongoing email correspondence is not a safe reason to leave that question unresolved.
Budsjekk can help identify what is holding the case up, gather missing information and organise the next investigations.
What to check
- Record the case reference and requested documents.
- Link each investigation to its report and date.
- Have time limits assessed if the case is prolonged.