A request for further information means the municipality needs more material to process the application. Start by identifying exactly what each point asks for. A structured response with clear attachments is usually easier to use than resending the entire original application without explanation.

Turn the letter into specific tasks

Create a working list of the municipality’s points, the missing information and who can provide it. Some items may already exist in your files. Others may require a measurement, an explanation from the designer or a decision about the proposal itself.

If a request is unclear, ask before commissioning extensive work. Refer to the case number and particular point, then explain the uncertainty. Asking which height needs to be shown is more useful than a general question about why a drawing was considered inadequate.

Make the attachments easy to find

Follow the order of the municipality’s letter. Explain under each point what has been supplied or changed and name the attachment. If a drawing is revised, identify the earlier version it replaces. Keep both versions in your own project folder.

Check whether the correction affects other documents. An amended area may require updates to the form, drawing and calculation. Changing one figure in only one place can leave contradictions that create another round of questions.

Follow up unresolved items

DiBK emphasises the importance of a complete application for processing. Submit a checked, coherent package when possible. If something will follow separately, identify it and explain when you expect to respond. Check the deadline in the letter and make contact if more time is needed.

Save the submission receipt and verify that it relates to the right building case. Where there is a responsible applicant, coordinate the response through that role. Budsjekk can help review the letter and move the follow-up work forward.

What to check

  • List each item in the municipality’s letter.
  • Link every response to a specific document or drawing.
  • Identify remaining questions and follow up receipt.