If the register shows an unexpected building type, area or status, identify the precise entry first. Kartverket explains that suspected errors in building information can be raised with the municipality. The municipality assesses whether correction is possible and what evidence is required.

Check that it is the right building

A property can contain several registered buildings. Note the building number and establish whether the entry concerns the house, garage or another structure. Keep a copy showing the disputed field and record where and when you found it.

Explain what appears incorrect and what you believe the correct entry should be. Pointing to a specific building type or status is more useful than saying the entire property record is wrong. If several fields are involved, list them separately.

Compare like-for-like information

Find the document you are comparing with and check that it concerns the same building. For area differences, establish the area definition and measurement basis before drawing a conclusion. Different figures may describe different things, and a correction request needs an understandable basis.

If the question concerns approved use or earlier alterations, find the building decisions and drawings as well. Ask for the register issue and approval issue to be clarified in the appropriate context. An updated register entry should not become the sole answer to a separate unresolved building case.

Submit a focused correction request

Identify the property, building, field and supporting documents. Refer to particular pages or drawing numbers. If the municipality requires different evidence, ask for a specific explanation of the missing material.

Keep the response and check the relevant entry once the matter has been dealt with. If the same information appears in other records used for a sale or application, make sure those following the case know about the clarification. Budsjekk can help review the records and prepare the enquiry.

What to check

  • Record the building number and the entry that appears wrong.
  • Keep a copy of the information shown in the lookup.
  • Provide documents supporting the correction you are requesting.