An extension is easier to plan when its purpose, position and connection to the house are clear from the start. Find drawings of the existing home and a property map. These let you examine the proposal before committing to a finished design or a supplier’s package.

Describe the size and use

Explain what the extra space is for, such as an entrance, living room or storage room. Mark where the outside wall would be opened, how the roof meets the house and whether the ground level would change. A rough sketch can support an initial discussion, provided dimensions and uncertainties are clearly marked.

DiBK offers a guide for smaller extensions. Any exemption from an application must be considered alongside the property’s planning rules, building lines and other conditions. Size alone does not settle that question. Keep the material used for the assessment with your project records.

Use one consistent design across the drawings

The site layout, floor plan, elevations and section should describe the same proposal. DiBK’s drawing guidance calls for scaled and dimensioned drawings. Check that roof lines, heights and ground levels agree between sheets. An elevation showing an old roof design alongside a revised floor plan can create unnecessary questions.

Keep a drawing list with revision references and dates in the working folder. When the extension moves or changes size, update the other affected documents too. Ask the designer or supplier for a complete current set rather than submitting several sketches with conflicting information.

Examine the connection to the existing house

Gather what is known about foundations, load-bearing walls, services and drainage where the extension will meet the house. Photograph the area before it is covered. Establish who will examine unknown conditions and what information they need to plan the work.

Budsjekk can help assemble the application material and organise the necessary follow-up. Describe the extension you are planning.

What to check

  • Describe how the extension will be used.
  • Show its connection to the house and position on the plot.
  • List questions about ground, structure and existing services.